EXPOSE UNDERGROUND SERVICES
(Potholing & Positive Identification)
​
When underground utilities need to be confirmed with absolute accuracy, non-destructive digging (NDD) is the safest and most reliable method. Vacsafe provides professional potholing and vacuum excavation to expose underground services without causing damage to the surrounding area.
Whether you're working on civil construction, mining, council projects, or private property works, our NDD process ensures every buried asset is identified safely, cleanly, and precisely.
What Is Non-Destructive Digging (NDD)?
Non-destructive digging uses high-pressure water and a vacuum extraction system to remove soil without harming underground utilities.
This method allows us to safely expose assets such as power, water, fibre, stormwater and gas lines.
NDD is the industry-preferred method for confirming the exact depth, alignment, and condition of services before mechanical excavation begins.
​
Why Expose Underground Services?
Even with DBYD plans and electromagnetic locating, the exact position of underground utilities can vary due to:
-
Inaccurate or outdated utility maps
-
Past repairs or relocations
-
Unmarked or abandoned services
-
Deep or complex service alignments
-
Crossings between multiple utilities
Potholing provides a Positive Identification (Positive ID) by physically exposing the asset so there is no guesswork.
​
Benefits of NDD Potholing
✔ Zero-damage method – protects pipes, cables, and conduits
✔ Pinpoint accuracy – confirms depth and alignment
✔ Safety compliance – reduces risk of strikes or outages
✔ Fast and efficient – small access footprint
✔ Essential for tight or sensitive sites
✔ Suitable for high-risk utilities (gas, HV cables, fibre)
✔ Clean and controlled excavation
​
What We Can Positively Identify
Our vacuum excavation teams can safely expose:
-
Electrical conduits and high-voltage cables
-
Water and recycled water lines
-
Stormwater and sewer
-
Gas mains and services
-
Fibre optic and communications
-
Irrigation and private services
-
Unidentified or abandoned assets
Our Potholing Process
-
Review DBYD & service locating results
-
Mark out safe dig areas and target spots
-
Perform NDD using water pressure & vacuum extraction
-
Expose and clean around the utility
-
Depth measurement & photographic documentation
-
Backfill or leave exposed as required
-
Provide reporting (optional)
When Should You Pothole?
NDD is recommended before:
-
Trenching or open-cut excavation
-
Installing footings or piers
-
Horizontal directional drilling (HDD)
-
Installing fences, poles, signs, or structures
-
Road or civil construction
-
Verifying utility locations from service locating
-
Any high-risk excavation around critical infrastructure
​